The thermal power station of Eurasian Power Corporation JSC (the Eurasian Power Corporation is a member of the ENRC concern) with the capacity of 2,100 MW is one of the junction points of the Kazakhstan power system and connects the North-East Kazakhstan with the power systems of West Siberia and Altai Region. The investment program implies reconstruction of all 8 power generation units of the station by 2018. SibEnergoGroup GC has prepared a project of reconstruction of power generation unit No. 5. The main and auxiliary equipment of the power generation unit was completely replaced in compliance with the work plan. A turbine set of the new generation was installed instead of the outdated turbine. The second unit was restored, commissioning was performed before unit No. 6 was started. Auxiliary equipment of the leading world producers was introduced in reconstructing the station: electric filters and mills of the Alstom concern, the electrotechnical equipment by Emerson, etc. A feasibility study of investments was performed. The term to implement the project is 2008-2014.
The full complex of the station reconstruction works included:
Design stage:
- Project of reconstruction of the outdoor switchgear – 220 kV;
- Working project of “Replacement of Switchgear 1HO-2HO”;
- Working project of “Replacement of Backup Exciter РВ-3”;
- Working project of “Circulation Water Flow Rate Metering Unit”;
- Reconstruction project for substation TRP-7 (Traction Distribution Substation 7) of the Vostochny Coal Mine;
- Reconstruction project of power generation unit No. 5;
- Working project of “Center of Dispatch Control”;
- Reconstruction of an electric filter on the body of boiler 5Б;
- Project of replacement of a high-pressure heater on power generation unit No. 4;
- Project of replacement of an electric filter on the body of boiler No. 5a of power generation unit No. 5;
- Project of reconstruction of the electrotechnical part of power generation unit No. 6 of the thermal power station in the city of Aksu;
- Design works and engineering services for the automated control system of technological processes at the station level;
- Author supervision of replacement of a turbine set of power generation unit No. 6;
- Preparing an assignment for the fuel feed line reconstruction;
- Replacement project for electrolyzer unit No. 2;
- Replacement project for electric filters of power generation unit No. 6;
- Design and estimate documentation for modernization of high-pressure heater of power generation unit No. 1 of the thermal power station in the city of Aksu;
- Development of a project of reconstruction of electricity supply of the electric filter of unit No. 3;
- Replacement project for a turbine set of power generation unit No. 6 of the thermal power station in the city of Aksu;
- Construction project for ash dump No. 3;
- Author supervision of replacement of a turbine set of power generation unit No. 2;
- Inspection of structure units of wagon dumper No. 1;
- Replacement project for a turbine set of power generation unit No. 2 of the thermal power station in the city of Aksu;
- Replacement project for electric filters of power generation unit No. 2.
Technological development:
- Inspection of structure units of power generation unit No. 6.
Supply of boiler accessories:
- Supply of plasma ignition safety devices.
Commissioning:
- A complex of commissioning works for turbine set ХТЗ-325-32,5 and turbine generator ТВГ-325 of power generation unit No. 3;
- Commissioning of boiler equipment of power generation unit No. 6;
- Commissioning at power generation unit No. 6;
- Supervised installation and commissioning of ignition safety devices at power generation unit No. 6;
- Commissioning in replacing power generation unit No. 2 of the thermal power station in the city of Aksu.